17th Street Bridge to Undergo Full Closure for Traffic Shift Operations, August 29 through August 31, 2023
Vero Beach, Fl (treasurecoast.com) – The 17th Street Bridge to Undergo Full Closure for Traffic Shift Operations, August 29 through August 31, 2023.
Here are the details:
***17th Street Bridge to Undergo Full Closure for Traffic Shift Operations, August 29 through August 31, 2023***
Beginning at 12 a.m., Tuesday, Aug. 29, the SR 656/17th Street Bridge between SR A1A and Indian River Boulevard, will be closed around-the-clock through approximately 5 a.m., Thursday, Aug. 31, for traffic shift operations.
• Westbound motorists will be detoured via SR A1A and Beachland Boulevard to Indian River Boulevard.
• Eastbound motorists will be detoured via Indian River Boulevard and Beachland Boulevard to SR A1A.
• Local traffic only will be allowed on the east side of the bridge.
• Once the traffic shift is completed, one eastbound and westbound lane will be in each direction on the south side of the bridge.
Project website: www.d4fdot.com